PROJECT MAPS



June 2003

Aerial Photo of 1995 and 1998 Flood Damaged Area

April 2003

Aerial Photo of Project Area with Alternatives


PHOTOGRAPHS



April 2003

Photos


TECHNICAL REPORTS AND MEETING DOCUMENTS



September 9, 2003

Summary of Alternatives for the Resource Agency Presentation, Map of Proposed Alternatives, Conceptual Cross Sections: Composite n=.04, Alternative 2A and 3, Alternative 2C, Alternative 2D.

July 28, 2003

Stable Planform Study (UPDATED)

July 22, 2003

Pajaro River Watershed Flood Protection Plan (Bob Curry - Draft) Part 1, Part 2, Part 3, Part 4, References, Historical Changes, Map.

Minutes from 7/22/2003 Technical Meeting #9, Memorandum from Corps in response to Minutes #9.

July 2003

An Environmental Alternative for the Pajaro River Flood Plan Report, Figure 1, Figures 2-34.

June 2003

Minutes from 6/19/2003 Technical Meeting #8., NOAA Comments on NED Plans.

Conceptual Cross Section of 100 Foot setback with Dimensions

Updated Stable Planform and Channel Forming Analysis , Stable Channel Data, Notes 4/03 ,Geomorphic Design Cross Section, Geomorphic Dimensions, Resource Agency Alternative Plan View.

April 2003

Draft Design Recommendations - Riparian Planting and Maintenance, NOAA Fisheries Comments

Main Stem Alternative Feasibility , Tributary Alternative Feasibility

January 2003

Stable Planform and Channel Forming Analysis , Notes 4/03 , Update 11/02 , Sketch 11/02

October 2002

Primer on Stream Protection for the Regulator and Program Manager

August 2000

Channel Stability Problems: Pajaro River


WATERSHED STUDY


PHASE 1 REPORT - 7/2002

Phase 1 Final Report
Executive Summary
Table of Contents
Basis of Comparison
Collection and Analysis of Rainfall Data
Collection and Analysis of Runoff Data
Collection and Analysis of Sediment Data
River Geometry
Land Use and Soils
Hydrologic Model
Qualitative Sediment Analysis
Development of Sediment Model
Use Model to Show Impacts of Four Land Use Scenarios
Evaluation of Four Watershed Conditions - Sediment


PHASE 2 REPORT - 4/2003

Phase 2 Final Report
Executive Summary

PHASE 3

Phase 3 - Scope of Work and Comments


PUBLIC PRESENTATIONS

May 12, 2003

Review of Project Alternatives, Alternatives Sheet

March 3, 2003

Tributaries Presentation

September 12, 2002

Army Corps Planning Process Meeting

February 13, 2002

Flood Protection on the Salsipuedes and Corralitos Creeks for Property Owners and Residents

August 23, 2001

Public Stakeholder Meeting #3: Project Design Options - Continued

July 20, 2001

Public Stakeholder Meeting #2: Project Design Options

April 19, 2001

Congressmember Sam Farr's Initiation of Public Stakeholder Meeting Process


NEWSLETTERS

 

June 2002

Newsletter #1

November 2002

Newsletter #2


TEMPERATURE



1997-2002

Page 1 , Page 2 , Page 3 , Page 4 , Notes , Transmittal Letter

1978-2002


Thurwachter
, Above Salsipuedes , Chittenden
Thurwachter Notes , Above Salsipuedes Notes , Chittenden Notes


GIS DATA (Currently Offline)

April 1998

CD-ROM Contents, Scope of Work Description, Access Data


PUBLIC NOTICES (REGULATORY USACE)

January 2003

MCWRA Public Notice for Maintenance, Figures

January 2003

MCWRA Public Notice for Maintenance (Hwy 1), Figures


OTHERS



April 2003

Agency Contacts, Original Transmittal Letter

January 2003

Main Stem X-S , Tributary X-S , Stable Planform X-S

January 2003

HEC-RAS Data , Notes

December 2002

Santa Cruz County Maintenance Plans

June 2001

Notice of Intent to Prepare Joint EIS/R

1949-1995

Historical Profiles - DWG 1 , DWG 2 , DWG 3 , DWG 4 , Notes




CD Created by Chris Eng/USACE. Revision C.03.06.26. // 346+39 Files 748 MB // To view the entire contents of this Website, you will need access to Adobe Acrobat Reader , MS Word , MS Excel , MS PowerPoint , AutoCAD or compatible viewing software.