Upper Guadalupe River
Final Feasibility Report
and
Environmental Impact Statement/Report
January 1998
TABLE OF CONTENTS
These publications are provided in portable document format (PDF). In order to read or print the documents, you must download the Adobe Acrobat Reader.
EXECUTIVE SUMMARY
SUMMARY
1.0 NEED FOR AND OBJECTIVES OF THE
ACTION
2.0 PROPOSED PROJECT AND ALTERNATIVES
3.0 ENVIRONMENTAL
SETTING
4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL
CONSEQUENCES
OF
THE PROPOSED ACTION AND ALTERNATIVES
4.1
AIR QUALITY
4.2
GEOLOGIC RESOURCES
4.3
WATER RESOURCES
4.4 BIOLOGICAL RESOURCES
4.5
AESTHETICS AND RECREATION
4.6
NOISE
4.7 TRANSPORTATION
4.8 LAND USE
4.9 PUBLIC SERVICES AND UTILITIES
4.10 CULTURAL RESOURCES
4.11 HAZARDOUS MATERIALS
4.12
PUBLIC SAFETY
4.13 SOCIOECONOMICS
5.0 RECOMMENDATIONS
6.0 CUMULATIVE IMPACTS
7.0 THE RELATIONSHIP BETWEEN LOCAL
SHORT-TERM USES OF MAN'S ENVIRONMENT AND THE MAINTENANCE AND ENHANCEMENT
OF LONG-TERM PRODUCTIVITY
8.0 GROWTH-INDUCING IMPACTS
9.0 IRREVERSIBLE AND IRRETRIEVABLE
COMMITMENTS OF RESOURCES
10.0 PUBLIC INVOLVEMENT AND INTERAGENCY
COORDINATION
11.0 REFERENCES
12.0 PERSONS AND AGENCIES CONTACTED
13.0 LIST OF PREPARERS AND CONTRIBUTORS
14.0 ACRONYMS
15.0 INDEX 15-1
APPENDICES
A. AIR QUALITY REGULATIONS
B. AIR QUALITY EMISSION CALCULATIONS
C. AIR QUALITY CONFORMITY DETERMINATION
D. USFWS COORDINATION ACT REPORT
AND CORPS RESPONSES
E. VEGETATION IMPACTS AND MITIGATIONS FOR THE BYPASS CHANNEL PLAN
F. BIOLOGICAL DATA
G. CLEAN WATER ACT SECTION 404(b)(1)
DETERMINATION
H. WATER RESOURCES DATA
I. TRANSPORTATION LEVEL OF SERVICE
DEFINITIONS
J. HAZARDOUS MATERIALS DATA
K. DRAFT BIOLOGICAL ASSESSMENT
L. MITIGATION MONITORING AND REPORTING
PLAN
M. COMMENTS AND RESPONSES TO COMMENTS
ON THE DRAFT EIR/S
FIGURES (11x17)
4.5-1 Reach 7 Existing Visual Setting 4.5-3
4.5-2 Reach 8 Existing Visual Setting 4.5-5
4.5-3 Reach 9 Existing Visual Setting 4.5-7
4.5-4 Reach 10A Existing Visual Setting 4.5-9
4.5-5 Reach 10B Existing Visual Setting 4.5-11
4.5-6 Reach 10C Existing Visual Setting 4.5-15
4.5-7 Reach 11A Existing Visual Setting 4.5-17
4.5-8 Reach 11B and 11C Existing Visual Setting
4.5-19
4.5-9 Reach 12 Existing Visual Setting 4.5-21
Plate 1
Plate 2
Plate 3
Plate 4
Plate 5
Plate 6
Plate 7
Plate 8
Plate 9
Return to San Francisco District