PROJECT LOCATION AND DESCRIPTION

Redwood City Harbor is a mid-use, deep-draft harbor on San Francisco Bay in the County of San Mateo.  The project consists of San Bruno Shoal Channel, an entrance channel, outer channel, inner channel, and two turning basins.  The project is the only commercial deep-draft harbor in southern San Francisco Bay. Project Operations and Maintenance (O&M) provides for a two-year cycle of maintenance dredging of the main ship channel, which has an authorized project depth of 30 feet Mean Lower Low Water (MLLW). The ports major commodities include aggregates for the South Bay construction industry, recycled scrap metal, and recycled petroleum products.

 

TOTAL FUNDING

 

TOTAL COST

                                  N/A

FEDERAL COST

                                  N/A

NON-FEDERAL COST

                                  N/A

 

 

FISCAL YEAR 2020 ALLOCATION

                      $475,000

FY 2021 BUDGET

                      $8,460,000

COST TO COMPLETE

                                  N/A


FY 20 ACCOMPLISHMENTS

  • Performed Conditions surveys environmental coordination and to developed plans and specifications for the next dredge episode.

FY 21 accomplishments

  • Plan to perform dredging with a clamshell dredge contract.

ISSUES AND OTHER INFORMATION

  • This is a non-annual project with a dredging cycle of every two years.  Dredging is scheduled for FY21.
  • The CA State Coastal Conservancy has contributed approximately $5M to fund the additional cost of beneficial reuse.  We will use this funding to redirect a portion of the dredged material from in-bay disposal to beneficial reuse this summer.
  • The Port of RWC continues to support reducing the dredging cycle frequency from every two years to annually.  The PDT is evaluating the feasibility of this recommendation.

CONGRESSIONAL INTEREST

  • 14th District, Rep. Jackie Speier
  • 18th District, Rep. Anna Eshoo
  • 11th District, Congressman Mark DeSaulnier

POINT OF CONTACT

  • Deputy for Project Management, Edwin S. Townsley, (415) 503-6593.

Updated on 06 April 2021 


Click Map to Zoom In

Contact

Projects & Planning General Info
415-503-3674
450 Golden Gate
San Francisco, CA 94102