SAN PABLO BAY AND MARE ISLAND STRAIT
OPERATIONS AND MAINTENANCE

 

PROJECT LOCATION AND DESCRIPTION

San Pablo Bay and Mare Island Strait, which are located in Solano County, California, provide deep-water access to the Suisun Bay Channel and the Ports of Sacramento and Stockton. This project provides for maintenance dredging of (1) a 600-foot wide channel to a depth of 35 feet Mean Lower Low Water (MLLW), which is approximately 11 miles long, in San Pablo Bay across Pinole Shoal with a maneuvering area adjacent to Oleum Pier at the mouth of Carquinez Strait; (2) a 600-foot wide channel to 30 feet MLLW through Mare Island Strait, flaring to a turning basin generally 1,000 feet wide, from former dike number 6 to within 75 feet south of the causeway between Mare Island and Vallejo; (3) a channel to 30 feet MLLW up the Napa River, except (4) at the northerly end, at the City of Vallejo Marina, where the project depth is 26 feet MLLW.

 

TOTAL FUNDING

 

TOTAL COST

N/A

FEDERAL COST

N/A

NON-FEDERAL COST

N/A

 

 

FISCAL YEAR 2019 ALLOCATION

$   3,049,000

FY 2020 BUDGET

$  TBD

COST TO COMPLETE

N/A

 
 

FY 19 AND FY 20 ACCOMPLISHMENTS (based on the availability of funds)

  • Funds will be used for O&M dredging of Pinole Shoal Channel with the Government Dredge Essayons.
  • Dredging will likely be deferred in 2020 due to current RWQCB restrictions on hopper dredging (see Other Information below), and funds may remain unobligated. If RWQCB changes their restrictions, funds will be used for O&M dredging of Pinole Shoal Channel.
ISSUES AND OTHER INFORMATION 
  • The Port of Stockton and Contra Costa County are the Non-Federal Sponsors (NFS).
  • Maintenance dredging of Mare Island Strait was last performed in 1994.
  • With the closure of the Mare Island Naval Shipyard, the channel is no longer maintained at authorized project depth for deep draft vessels.
  • In 2015, the City of Vallejo requested a Section 216 evaluation of the Mare Island strait section of the project to support resumption of maintenance dredging to - 30’ depth after a multi-year lapse. The report was completed by Aug 2016 and sent to the sponsor.
  • Periodic surveys will be performed to monitor the rate of shoaling on Mare Island Strait.
  • New CD request to have a range of volumes from 150,000 CY to over 600,000 CY to cover the dry and wet year.

CONGRESSIONAL INTEREST

  • 5th District, Rep. Mike Thompson
  • 11th District, Congressman Mark DeSaulnier

 

POINT OF CONTACT

  • Deputy for Project Management, Edwin S. Townsley, (415) 503-6593.
 