Central Basin Pier 70 Dredging

CENTRAL BASIN PIER 70 DREDGING
CONTINUING AUTHORITY, SECTION 107

INVESTIGATIONS

Draft Detailed Project Report and Integrated Environmental Assessment (PDF)

PROJECT LOCATION AND DESCRIPTION

The project is located on the San Francisco shoreline southeast of the financial district at Pier 70 and the Central Basin. The goal of the project is to deepen the Central Basin to 32 feet mean lower low water (MLLW) to provide ship access to the largest dry dock on the west coast of the United States. In addition, access to the primary and secondary dry-dock operations is currently restricted by shoaling with a limiting depth of approximately 24 ft. MLLW. To remain competitive, the shipyard needs to be able to work on larger classes of vessels. Dredging the Central Basin to 32 ft. MLLW plus two feet of allowable over-depth will allow access for 95 percent of the classes of vessels that are likely to use the Pier 70 Shipyard.

Currently, the shipyard at Pier 70 is inactive and the local sponsor, the Port of San Francisco, has not identified an operator/tenant for the dry dock facilities. The Port is actively searching for a new operator/tenant and once found, Federal interest will be reconfirmed and the feasibility report will be completed.
 

TOTAL FUNDING

 

TOTAL COST

                   $ 11,512,000

FEDERAL COST

                   $   8,319,000

NON-FEDERAL COST

                   $   3,193,000

 

 

TOTAL FEDERAL COST THROUGH FY 2020

                   $   1,015,420

FY 2021 BUDGET

                   $              N/A 

COST TO COMPLETE                    $   7,303,580


FY 20 AND FY 21 ACCOMPLISHMENTS (subject to tenant being identified by the Port and based on the availability of funds)

  • Reconfirm Federal interest
  • Finalize Feasibility Report
  • Execute PPA
  • Initiate PED

ISSUES AND OTHER INFORMATION

  • The Port of San Francisco is the Non-Federal Sponsor (NFS).

CONGRESSIONAL INTEREST

  • 12th District, Rep. Nancy Pelosi

POINT OF CONTACT

  • Deputy for Project Management, Edwin S. Townsley, (415) 503-6593.

Updated on 18 February 2020

 