Central Basin Pier 70 Dredging

CENTRAL BASIN PIER 70 DREDGING
CONTINUING AUTHORITY, SECTION 107

INVESTIGATIONS

Draft Detailed Project Report and Integrated Environmental Assessment (PDF)

PROJECT LOCATION AND DESCRIPTION

The project is located on the San Francisco shoreline southeast of the financial district at Pier 70 and the Central Basin. The goal of the project is to deepen the Central Basin to 32 feet mean lower low water (MLLW) to provide ship access to the largest dry dock on the west coast of the United States. However, access to the primary and secondary dry-dock operations is currently restricted by shoaling with a limiting depth of approximately 24 ft. MLLW. To remain competitive, the shipyard needs to be able to work on larger classes of vessels. Dredging the Central Basin to 32 ft. MLLW plus two feet of allowable overdepth will allow access for 95 percent of the classes of vessels that are likely to use the Pier 70 Shipyard.


 

TOTAL FUNDING

 

TOTAL COST

                   $ 11,512,000

FEDERAL COST

                   $   8,319,000

NON-FEDERAL COST

                   $   3,193,000

 

 

TOTAL FEDERAL COST THROUGH FY 2019

                   $   1,041,116

FY 2020 BUDGET

                   $                 0 

COST TO COMPLETE                    $   6,627,884


FY 19 ACCOMPLISHMENTS (based on the availability of funds)

  • Conduct DQC/ATR
  • Finalize DPR/EA
  • Execute PPA
  • Complete Plans and Specifications
  • Award Dredging Contract (risk of slipping to FY18)

 FY 20 ACCOMPLISHMENTS

  • Complete dredging
  • Close-out Project

ISSUES AND OTHER INFORMATION

  • The Port of San Francisco is the Non-Federal Sponsor (NFS).

CONGRESSIONAL INTEREST

  • 12th District, Rep. Nancy Pelosi

POINT OF CONTACT

  • Deputy for Project Management, Edwin S. Townsley, (415) 503-6593.

Updated on 31 January 2019

 