PROJECT: Freshwater County Park Summer Dam Installation
PUBLIC NOTICE NUMBER: SPN-2007-00751N
PUBLIC NOTICE DATE: March 22, 2023
COMMENTS DUE DATE: April 21, 2023
PROJECT MANAGER: L. Kasey Sirkin TELEPHONE: 707-443-0855 E-MAIL: l.k.sirkin@usace.army.mil
INTRODUCTION: Humboldt County Department of Public Works (POC: Mr. Andrew Bundschuh 707-445-7741), 1106 2nd Street, Eureka, California, has applied to the U.S. Army Corps of Engineers (USACE), San Francisco District, for a Department of the Army Permit to annually install a summer dam for recreational purposes, on Freshwater Creek, tributary to Humboldt Bay. This Department of the Army permit application is being processed pursuant to the provisions of Section 404 of the Clean Water Act of 1972, as amended (33 U.S.C. § 1344 et seq.).
PROPOSED PROJECT:
Project Site Location: 3100 Freshwater Road, within Freshwater County Park, in Humboldt County, California, at latitude 40.634762º longitude -124.281276. See enclosure 1.
Project Site Description: The seasonal dam site is located within a small county park that has been owned and operated by Humboldt County since 1939. Freshwater Creek is a perennial stream, tributary to Humboldt Bay. The surrounding area is rural residential with a small quantity of commercial areas and the watershed has a history of logging activities. See enclosure 1.
Project Description: As shown in the attached drawings, the applicant proposes to annually install a flash-board dam to create a recreational pool for the general public at Freshwater County. Installation of the dam would require grading of approximately 135 cubic yards of instream material and temporary impacts to approximately 0.55 acre of Other Waters of the U.S. The dam would be installed and operated between June and September annually, and the site would be restored to pre-dam conditions following the recreational season.
Basic Project Purpose: The basic project purpose comprises the fundamental, essential, or irreducible purpose of the project, and is used by USACE to determine whether the project is water dependent. The basic project purpose is to provide recreational opportunity.
Overall Project Purpose: The overall project purpose serves as the basis for the Section 404(b)(1) alternatives analysis and is determined by further defining the basic project purpose in a manner that more specifically describes the applicant's goals for the project while allowing a reasonable range of alternatives to be analyzed. The overall project purpose is to create a seasonal recreational swimming hole for public use.
Project Impacts: Temporary impacts to approximately 0.055 acre of Other Waters of the U.S. from the grading of the dam installation area, and potentially 135 cubic yards of gravel material discharged annually.
Proposed Mitigation: No mitigation has been proposed as the project would only result in temporary impacts and there would be no loss of Wetlands or Other Waters of the U.S.
Project Alternatives: USACE has not endorsed the submitted alternatives analysis at this time. USACE will conduct an independent review of the project alternatives prior to reaching a final permit decision.
STATE AND LOCAL APPROVALS:
Water Quality Certification: State water quality certification or a waiver thereof is a prerequisite for the issuance of a Department of the Army Permit to conduct any activity which may result in a fill or pollutant discharge into waters of the United States, pursuant to Section 401 of the Clean Water Act of 1972, as amended (33 U.S.C. § 1341 et seq.). The applicant has recently submitted an application to the California Regional Water Quality Control Board (RWQCB) to obtain water quality certification for the project. No Department of the Army Permit will be issued until the applicant obtains the required certification or a waiver of certification. A waiver can be explicit, or it may be presumed if the RWQCB fails or refuses to act on a complete application for water quality certification within 60 days of receipt, unless the District Engineer determines a shorter or longer period is a reasonable time for the RWQCB to act.
Water quality issues should be directed to the Executive Officer, California Regional Water Quality Control Board, North Coast Region, 5550 Skylane Boulevard, Suite A, Santa Rosa, California 95403, by the close of the comment period.
Coastal Zone Management: The project does not occur in the coastal zone, and a preliminary review by USACE indicates the project is not likely to affect coastal zone resources. This presumption of effect, however, remains subject to a final determination by the California Coastal Commission.
Other Local Approvals: The applicant will be applying for the following additional governmental authorizations for the project. A Lake and Streambed Alteration Agreement to be issued by the California Department of Fish and Wildlife.
COMPLIANCE WITH VARIOUS FEDERAL LAWS:
National Environmental Policy Act (NEPA): Upon review of the Department of the Army permit application and other supporting documentation, USACE has made a preliminary determination that the project neither qualifies for a Categorical Exclusion nor requires the preparation of an Environmental Impact Statement for the purposes of NEPA. At the conclusion of the public comment period, USACE will assess the environmental impacts of the project in accordance with the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. §§ 4321-4347), the Council on Environmental Quality's regulations at 40 C.F.R. § 1500‑1508, and USACE regulations at 33 C.F.R. § 325. The final NEPA analysis will normally address the direct, indirect, and cumulative impacts that result from regulated activities within the jurisdiction of USACE and other non-regulated activities USACE determines to be within its purview of Federal control and responsibility to justify an expanded scope of analysis for NEPA purposes. The final NEPA analysis will be incorporated in the decision documentation that provides the rationale for issuing or denying a Department of the Army Permit for the project. The final NEPA analysis and supporting documentation will be on file with the San Francisco District, Regulatory Division.
Endangered Species Act (ESA): Section 7(a)(2) of the ESA or 1973, as amended (16 U.S.C. § 1531 et seq.), requires Federal agencies to consult with either the U.S. Fish and Wildlife Service (USFWS) or the National Marine Fisheries Service (NMFS) to ensure actions authorized, funded, or undertaken by the agency are not likely to jeopardize the continued existence of any Federally-listed species or result in the adverse modification of designated critical habitat. As the Federal lead agency for this project, USACE has conducted a review of the California Natural Diversity Data Base, digital maps prepared by USFWS and NMFS depicting critical habitat, and other information provided by the applicant to determine the presence or absence of such species and critical habitat in the project area. Based on this review, USACE has made a preliminary determination that the following Federally-listed species and designated critical habitat are present at the project location or in its vicinity and may be affected by project implementation. Southern Oregon-Northern California Coast (SONCC) Coho salmon, Northern California (NC) steelhead, and California Coast (CC) Chinook salmon and critical habitat for these species. To address project related impacts to these species and designated critical habitat, USACE will initiate formal consultation with NMFS, pursuant to Section 7(a) of the Act. Any required consultation must be concluded prior to the issuance of a Department of the Army Permit for the project.
Magnuson-Stevens Fishery Conservation and Management Act (MSFCMA): Section 305(b)(2) of the MSFCMA of 1966, as amended (16 U.S.C. § 1801 et seq.), requires Federal agencies to consult with the National Marine Fisheries Service (NMFS) on all proposed actions authorized, funded, or undertaken by the agency that may adversely affect essential fish habitat (EFH). EFH is defined as those waters and substrate necessary to fish for spawning, breeding, feeding, or growth to maturity. EFH is designated only for those species managed under a Federal Fisheries Management Plan (FMP), such as the Pacific Groundfish FMP, the Coastal Pelagics FMP, or the Pacific Coast Salmon FMP. As the Federal lead agency for this project, USACE has conducted a review of digital maps prepared by NMFS depicting EFH to determine the presence or absence of EFH in the project area. Based on this review, USACE has made a preliminary determination that EFH is present at the project location or in its vicinity and that the critical elements of EFH may be adversely affected by project implementation. Pacific Salmon FMP. To address project related impacts to EFH, USACE will initiate consultation with NMFS, pursuant to Section 305(5(b)(2) of the Act. Any required consultation must be concluded prior to the issuance of a Department of the Army Permit for the project.
Marine Protection, Research, and Sanctuaries Act (MPRSA): Section 302 of the MPRSA of 1972, as amended (16 U.S.C. § 1432 et seq.), authorizes the Secretary of Commerce, in part, to designate areas of ocean waters, such as the Cordell Bank, Gulf of the Farallones, and Monterey Bay, as National Marine Sanctuaries for the purpose of preserving or restoring such areas for their conservation, recreational, ecological, or aesthetic values. After such designation, activities in sanctuary waters authorized under other authorities are valid only if the Secretary of Commerce certifies that the activities are consistent with Title III of the Act. No Department of the Army Permit will be issued until the applicant obtains any required certification or permit. The project does not occur in sanctuary waters, and a preliminary review by USACE indicates the project is not likely to affect sanctuary resources. This presumption of effect, however, remains subject to a final determination by the Secretary of Commerce or his designee.
National Historic Preservation Act (NHPA): Section 106 of the NHPA of 1966, as amended (16 U.S.C. § 470 et seq.), requires Federal agencies to consult with the appropriate State Historic Preservation Officer to take into account the effects of their undertakings on historic properties listed in or eligible for listing in the National Register of Historic Places. Section 106 of the Act further requires Federal agencies to consult with the appropriate Tribal Historic Preservation Officer or any Indian tribe to take into account the effects of their undertakings on historic properties, including traditional cultural properties, trust resources, and sacred sites, to which Indian tribes attach historic, religious, and cultural significance. As the Federal lead agency for this undertaking, USACE has conducted a review of the latest published version of the National Register of Historic Places, survey information on file with various city and county municipalities, and other information provided by the applicant to determine the presence or absence of historic and archaeological resources within the permit area. Based on this review, USACE has made a preliminary determination that historic or archaeological resources are not likely to be present in the permit area and that the project either has no potential to cause effects to these resources or has no effect to these resources. USACE will render a final determination on the need for consultation at the close of the comment period, taking into account any comments provided by the State Historic Preservation Officer, the Tribal Historic Preservation Officer, the Advisory Council on Historic Preservation, and Native American Nations or other tribal governments. If unrecorded archaeological resources are discovered during project implementation, those operations affecting such resources will be temporarily suspended until USACE concludes Section 106 consultation with the State Historic Preservation Officer or the Tribal Historic Preservation Officer to take into account any project related impacts to those resources.
COMPLIANCE WITH THE SECTION 404(b)(1) GUIDELINES: Projects resulting in discharges of dredged or fill material into waters of the United States must comply with the Guidelines promulgated by the Administrator of the Environmental Protection Agency under Section 404(b) of the Clean Water Act (33 U.S.C. § 1344(b)). An evaluation pursuant to the Guidelines indicates the project is dependent on location in or proximity to waters of the United States to achieve the basic project purpose. This conclusion raises the (rebuttable) presumption of the availability of a practicable alternative to the project that would result in less adverse impacts to the aquatic ecosystem while not causing other major adverse environmental consequences. The applicant has been informed to submit an analysis of project alternatives to be reviewed for compliance with the Guidelines.
PUBLIC INTEREST EVALUTION: The decision on whether to issue a Department of the Army Permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the project and its intended use on the public interest. Evaluation of the probable impacts requires a careful weighing of the public interest factors relevant in each particular case. The benefits that may accrue from the project must be balanced against any reasonably foreseeable detriments of project implementation. The decision on permit issuance will, therefore, reflect the national concern for both protection and utilization of important resources. Public interest factors which may be relevant to the decision process include conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.
CONSIDERATION OF COMMENTS: USACE is soliciting comments from the public; Federal, State, and local agencies and officials; Native American Nations or other tribal governments; and other interested parties in order to consider and evaluate the impacts of the project. All comments received by USACE will be considered in the decision on whether to issue, modify, condition, or deny a Department of the Army Permit for the project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, and other environmental or public interest factors addressed in a final environmental assessment or environmental impact statement. Comments are also used to determine the need for a public hearing and to determine the overall public interest in the project.
SUBMITTING COMMENTS: During the specified comment period, interested parties may submit written comments to L. Kasey Sirkin, San Francisco District, Regulatory Division, Eureka Field Office, 601 Startare Drive, Box 14, Eureka, California 95501 or by email l.k.sirkin@usace.army.mil; comment letters should cite the project name, applicant name, and public notice number to facilitate review by the Regulatory Permit Manager. Comments may include a request for a public hearing on the project prior to a determination on the Department of the Army permit application; such requests shall state, with particularity, the reasons for holding a public hearing. All substantive comments will be forwarded to the applicant for resolution or rebuttal. Additional project information or details on any subsequent project modifications of a minor nature may be obtained from the applicant and/or agent or by contacting the Regulatory Permit Manager by telephone or e-mail (cited in the public notice letterhead). An electronic version of this public notice may be viewed under the Public Notices tab on the USACE website: https://www.spn.usace.army.mil/Missions/Regulatory.