Under the Corps' Regulatory Program, a public notice is the primary method for advising all interested parties of a proposed activity for which a permit is sought. Public notices are also published to inform the public about new or proposed regulations, policies, guidance or permit procedures.

We are requesting public comments on many Public Notices (PNs) concurrently; please pay careful attention to the file number and the comments Due Date.

Email comments are preferred.  To submit comments in writing, send them to the attention of the Project Manager listed in the Public Notice title block.  All comments should reference the PN file number and be submitted by the Response Required Date on the PN.


The Public Notices are in pdf format. To read the files you may need to download and install Adobe Acrobat Reader or another comparable program

Expand List item 26931Collapse List item 26931  Receive Regulatory Program Public Notices

If you would like to be added to one or more of the public notice mailing lists, send an email to cespn-rg-info@usace.army.mil with your contact information (Name, Organization, Mailing Address, Email, Phone Number) and the notification list(s) you would like to be added to:

All Counties within San Francisco District 
- or -
Alameda  |  Contra Costa  |  Del Norte  |  Humboldt  |  Marin  |  Mendocino
Monterey  |  Napa  |  San Benito  |  San Francisco  |  San Luis Obispo  |  San Mateo
Santa Clara  |  Santa Cruz  |  Siskiyou  |  Solano  |  Sonoma  |  Trinity

 


If you are on our mailing list and your contact information changes, please notify cespn-rg-info@usace.army.mil with your new addresses.  E-mails returned due to a non-functioning address will be removed from notification lists.

SPN-2002-267760 Peyton Slough Remediation Maintenance Project

RGS
Published Nov. 21, 2024
Expiration date: 12/21/2024

PROJECT: Peyton Slough Remediation Maintenance Project

PUBLIC NOTICE NUMBER: SPN-2002-267760

PUBLIC NOTICE DATE: November 21, 2024

COMMENTS DUE DATE: December 21, 2024

PERMIT MANAGER: Jennifer Stabile                        TELEPHONE: 415-503-6783                     E-MAIL: Jennifer.L.Stabile@usace.army.mil


INTRODUCTION:

Eco Services Operations Corporation (POC: Mary Brown, 713-201-1273), 100 Mococo Road, Martinez, California 94553, through its agent, AECOM (POC:  Dillon Lennebacker, 510-874-3035), 300 Lakeside Drive, Suite 400, Oakland, California 94612, has applied to the U.S. Army Corps of Engineers (USACE), San Francisco District, for a Department of the Army Regional General Permit (RGP) to authorize fill material and work within jurisdictional waters of the United States, for maintenance and adaptive management to maintain the integrity of the completed Peyton Slough Remediation Project (Remediation Project) over the next 5 years. The Remediation Project was implemented to remediate legacy copper and zinc contamination by-products of prior industrial processes at the site per Regional Water Quality Control Board order (RWQCB Order No. 01-094).

This Department of the Army permit application is being processed pursuant to the provisions of Section 404 of the Clean Water Act of 1972, as amended (33 U.S.C. § 1344 et seq.), and Section 10 of the Rivers and Harbors Act of 1899, as amended (33 U.S.C. § 403 et seq.). The Remediation Project, previously authorized by USACE as a Standard Individual Permit, was completed in 2006 and concluded its 10-year compliance monitoring, maintenance, and adaptive management period in 2016.  The proposed necessary and ongoing maintenance activities would span a 10-year time period. This RGP was initially issued on October 29, 2020, with an expiration date of September 1, 2025. Due to a change in project impact amounts, the Corps is proposing to issue a revised RGP.

PROPOSED PROJECT:

Project Site Location: The project is located at 100 Mococo Road in the City of Martinez, Contra Costa County, California. The area is east of the Benicia-Martinez Bridge and west of Peyton Slough, between Carquinez Strait and Waterfront Road and adjacent to Eco Services’ Sulfuric Acid Regeneration Plant (38.0319°N, 122.1108°W; APN 159-320-008, 159-320-009, 159-320-003, 159-310-039, 159-320-004, 159-330-002, and 159-310-038; Vine Hill USGS Quadrangle Map) (Figures 1-2).

Project Site Description: The project area is a brackish tidal marsh and is bordered on the north by Carquinez Strait. Past land use included a copper processing facility that left legacy contamination at the site. The completed Remediation Project dredged contaminated sediments from the old Peyton Slough, filled and capped the slough and dredged a new slough parallel to, and approximately 400 feet east of, the original Peyton Slough. An armored bulkhead was installed to protect the remediation cap, but over the last 10 years ongoing erosion has threatened the bulkhead and cap. Components of the completed Remediation Project are detailed in Figures C-14A - C18A. The project area contains 14.74 acres of jurisdictional waters of the U.S., including 14.54 acres of tidal wetlands, 0.09 acre of other waters that are subject only to Section 404 of the Clean Water Act, and an additional 0.015 acre of other waters that are subject to both Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act.

Project Description: The proposed Peyton Slough Remediation Maintenance Project (Maintenance Project) would prevent legacy contamination from entering the site’s tidal wetlands and other waters of the U.S. while preserving the site’s wetland habitat values. The Maintenance Project includes planned maintenance to install erosion control measures to protect the north bulkhead and remediated slough cap, and other as-needed settlement fill, erosion and headcut repair, drainage ditch cuts, and levee and berm maintenance. As-needed actions are included in the proposal because they may become necessary during the next 5 years to maintain the integrity of the completed Remediation Project. These maintenance activities are proposed to be authorized and implemented as needed at any time during the expected 5-year duration of the permit. Levee road repairs would not cause discharge into waters or wetlands and no work is anticipated for the North Bulkhead, South Bulkhead, Carquinez Strait shoreline, or Peyton Slough tide gate as part of this maintenance project.

Basic Project Purpose: The basic project purpose comprises the fundamental, essential, or irreducible purpose of the project, and is used by USACE to determine whether the project is water dependent. The basic project purpose is to maintain the protective remediation cap and bulkheads that have been placed on the former Peyton Slough to prevent the release of legacy contamination while preserving the maximum extent of intertidal wetland habitat.

Overall Project Purpose: The overall project purpose is to conduct maintenance and adaptive management actions that would prevent the exposure of contaminants that are buried within the former Peyton Slough under a protective cap at the Peyton Slough Marsh, while also preserving the project area’s tidal wetland habitat in the context of current erosive conditions in Carquinez Strait and projected sea level rise.

Project Impacts: The proposed maintenance activities would consist of as-needed impacts pertaining to maintenance and adaptive management over 5 years. The proposed as-needed maintenance and adaptive management impacts are estimated to include: reused San Francisco Bay mud sourced off site and placed within tidal wetlands as needed for settlement fill; placement of Bay mud, rhizomatous vegetation stands, root wads, or sheet piles for erosion and headcut prevention; excavation of in-situ materials for drainage ditch cuts, and placement of Bay mud and imported soil for protection berm maintenance. Additional maintenance activities outside of USACE jurisdiction may include levee road repairs. Restoration of disturbed areas and additional unvegetated areas would be implemented after ground-disturbing activities.

Proposed Mitigation: The maintenance activities for the Remediation Project goals are aimed at restoring the marsh plain elevation to support wetlands while simultaneously protecting the Remediation Project cap. Maintenance and adaptive management activities would be kept to the minimum extent possible to achieve these goals to maintain the marsh integrity. Because there would be no expected loss of wetlands or other waters of the U.S., USACE has made a preliminary determination that no compensatory mitigation would be required.

Project Alternatives: Evaluation of this proposed activity’s impacts includes application of the guidelines promulgated by the Administrator of the Environmental Protection Agency under Section 404(b)(1) of the Clean Water Act (33 U.S.C. Section 1344(b)). An evaluation has been made by this office under the guidelines and it was determined that the proposed project is water dependent.

STATE AND LOCAL APPROVALS:

Water Quality Certification: State water quality certification or a waiver thereof is a prerequisite for the issuance of a Department of the Army Permit to conduct any activity which may result in a fill or pollutant discharge into waters of the United States, pursuant to Section 401 of the Clean Water Act of 1972, as amended (33 U.S.C. § 1341 et seq.). The applicant has recently submitted an application to the California Regional Water Quality Control Board (RWQCB) to obtain water quality certification for the project. No Department of the Army Permit will be issued until the applicant obtains the required certification or a waiver of certification. A waiver can be explicit, or it may be presumed if the RWQCB fails or refuses to act on a complete application for water quality certification within 60 days of receipt, unless the District Engineer determines a shorter or longer period is a reasonable time for the RWQCB to act.

Water quality issues should be directed to the Executive Officer, California Regional Water Quality Control Board, San Francisco Bay Region, 1515 Clay Street, Suite 1400, Oakland, California 94612, by the close of the comment period.

Coastal Zone Management: Section 307(c) of the Coastal Zone Management Act of 1972, as amended (16 U.S.C. § 1456(c) et seq.), requires a non-Federal applicant seeking a federal license or permit to conduct any activity occurring in or affecting the coastal zone to obtain a Consistency Certification that indicates the activity conforms with the state’s coastal zone management program. Generally, no federal license or permit will be granted until the appropriate state agency has issued a Consistency Certification or has waived its right to do so. Since the project occurs in the coastal zone or may affect coastal zone resources, the applicant has applied for a Consistency Determination from the San Francisco Bay Conservation and Development Commission to comply with this requirement.

Coastal zone management issues should be directed to the Executive Director, San Francisco Bay Conservation and Development Commission, 375 Beale St., Suite 510, San Francisco, CA  94105, by the close of the comment period.

Other Local Approvals: The applicant has applied for the following additional governmental authorizations for the project: a California Department of Fish and Wildlife Section 1602 CFGC LSAA Standard Agreement.

COMPLIANCE WITH VARIOUS FEDERAL LAWS:

National Environmental Policy Act (NEPA): Upon review of the Department of the Army permit application and other supporting documentation, USACE has made a preliminary determination that the project neither qualifies for a Categorical Exclusion nor requires the preparation of an Environmental Impact Statement for the purposes of NEPA. At the conclusion of the public comment period, USACE will assess the environmental impacts of the project in accordance with the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. § 4321-4347), the Council on Environmental Quality's regulations at 40 C.F.R. § 1500‑1508, and USACE regulations at 33 C.F.R. § 325. The final NEPA analysis will normally address the direct, indirect, and cumulative impacts that result from regulated activities within the jurisdiction of USACE and other non-regulated activities USACE determines to be within its purview of Federal control and responsibility to justify an expanded scope of analysis for NEPA purposes. The final NEPA analysis will be incorporated in the decision documentation that provides the rationale for issuing or denying a Department of the Army Permit for the project. The final NEPA analysis and supporting documentation will be on file with the San Francisco District, Regulatory Division.

Endangered Species Act (ESA): Section 7(a)(2) of the ESA of 1973, as amended (16 U.S.C. § 1531 et seq.), requires Federal agencies to consult with either the U.S. Fish and Wildlife Service (USFWS) or the National Marine Fisheries Service (NMFS) to ensure actions authorized, funded, or undertaken by the agency are not likely to jeopardize the continued existence of any Federally-listed species or result in the adverse modification of designated critical habitat. As the Federal lead agency for this project, USACE has conducted a review of the California Natural Diversity Data Base, digital maps prepared by USFWS and NMFS depicting critical habitat, and other information provided by the applicant to determine the presence or absence of such species and critical habitat in the project area. Based on this review, USACE has made a preliminary determination that the following Federally-listed species and designated critical habitat are present at the project location or in its vicinity and may be affected by project implementation. The area around Peyton Slough could contain Endangered salt-marsh harvest mouse (Reithrodontomys raviventris), Ridgway’s rail (Rallus obsoletus obsoletus) and soft salty bird’s-beak (Chloropyron molle ssp. molle). Construction and maintenance activities associated with this project have the potential to directly affect species through habitat disturbance and by the use of construction equipment which could cause injury or mortality to species. The placement of fill in marsh vegetation would also cause temporary disturbances by direct contact and increased noise in the project area. Erosion and sedimentation could occur during project activities which would have an adverse impact to habitat. To address project related impacts to Federally-listed species and designated critical habitat, USACE initiated formal consultation with USFWS, pursuant to Section 7(a) of the Act. Any required consultation must be concluded prior to the issuance of a Department of the Army Permit for the project.

Magnuson-Stevens Fishery Conservation and Management Act (MSFCMA): Section 305(b)(2) of the MSFCMA of 1966, as amended (16 U.S.C. § 1801 et seq.), requires Federal agencies to consult with the NMFS on all proposed actions authorized, funded, or undertaken by the agency that may adversely affect essential fish habitat (EFH). EFH is defined as those waters and substrate necessary to fish for spawning, breeding, feeding, or growth to maturity. EFH is designated only for those species managed under a Federal Fisheries Management Plan (FMP), such as the Pacific Groundfish FMP, the Coastal Pelagics FMP, or the Pacific Coast Salmon FMP. As the Federal lead agency for this project, USACE has conducted a review of digital maps prepared by NMFS depicting EFH to determine the presence or absence of EFH in the project area.  Based on this review, USACE has made a preliminary determination that EFH is not present at the project location or in its vicinity and that consultation will not be required. USACE will render a final determination on the need for consultation at the close of the comment period, taking into account any comments provided by NMFS.

Marine Protection, Research, and Sanctuaries Act (MPRSA): Section 302 of the MPRSA of 1972, as amended (16 U.S.C. § 1432 et seq.), authorizes the Secretary of Commerce, in part, to designate areas of ocean waters, such as the Cordell Bank, Gulf of the Farallones, and Monterey Bay, as National Marine Sanctuaries for the purpose of preserving or restoring such areas for their conservation, recreational, ecological, or aesthetic values. After such designation, activities in sanctuary waters authorized under other authorities are valid only if the Secretary of Commerce certifies that the activities are consistent with Title III of the Act. No Department of the Army Permit will be issued until the applicant obtains any required certification or permit. The project does not occur in sanctuary waters, and a preliminary review by USACE indicates the project is not likely to affect sanctuary resources. This presumption of effect, however, remains subject to a final determination by the Secretary of Commerce or his designee.

National Historic Preservation Act (NHPA): Section 106 of the NHPA of 1966, as amended (16 U.S.C. § 470 et seq.), requires Federal agencies to consult with the appropriate State Historic Preservation Officer to take into account the effects of their undertakings on historic properties listed in or eligible for listing in the National Register of Historic Places. Section 106 of the Act further requires Federal agencies to consult with the appropriate Tribal Historic Preservation Officer or any Indian tribe to take into account the effects of their undertakings on historic properties, including traditional cultural properties, trust resources, and sacred sites, to which Indian tribes attach historic, religious, and cultural significance. As the Federal lead agency for this undertaking, USACE has conducted a review of the latest published version of the National Register of Historic Places, survey information on file with various city and county municipalities, and other information provided by the applicant to determine the presence or absence of historic and archaeological resources within the permit area. Based on this review, USACE has made a preliminary determination that historic or archaeological resources are not likely to be present in the permit area and that the project either has no potential to cause effects to these resources or has no effect to these resources. USACE will render a final determination on the need for consultation at the close of the comment period, taking into account any comments provided by the State Historic Preservation Officer, the Tribal Historic Preservation Officer, the Advisory Council on Historic Preservation, and Native American Nations or other tribal governments.

COMPLIANCE WITH THE SECTION 404(b)(1) GUIDELINES:

Projects resulting in discharges of dredged or fill material into waters of the United States must comply with the Guidelines promulgated by the Administrator of the Environmental Protection Agency under Section 404(b) of the Clean Water Act (33 U.S.C. § 1344(b)). An evaluation pursuant to the Guidelines indicates the project is dependent on location in or proximity to waters of the United States to achieve the basic project purpose. This conclusion raises the (rebuttable) presumption of the availability of a practicable alternative to the project that would result in less adverse impacts to the aquatic ecosystem while not causing other major adverse environmental consequences. The applicant has submitted an analysis of project alternatives which is being reviewed by USACE.

PUBLIC INTEREST EVALUTION:

The decision on whether to issue a Department of the Army Permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the project and its intended use on the public interest. Evaluation of the probable impacts requires a careful weighing of the public interest factors relevant in each particular case. The benefits that may accrue from the project must be balanced against any reasonably foreseeable detriments of project implementation. The decision on permit issuance will, therefore, reflect the national concern for both protection and utilization of important resources. Public interest factors which may be relevant to the decision process include conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.

CONSIDERATION OF COMMENTS:

USACE is soliciting comments from the public; Federal, State, and local agencies and officials; Native American Nations or other tribal governments; and other interested parties in order to consider and evaluate the impacts of the project. All comments received by USACE will be considered in the decision on whether to issue, modify, condition, or deny a Department of the Army Permit for the project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, and other environmental or public interest factors addressed in a final environmental assessment or environmental impact statement. Comments are also used to determine the need for a public hearing and to determine the overall public interest in the project.

SUBMITTING COMMENTS:

During the specified comment period, interested parties may submit written comments to:

Jennifer Stabile, Project Manager
San Francisco District, Regulatory Division
450 Golden Gate Avenue, 4th Floor
San Francisco, California 94102-3404
Jennifer.L.Stabile@usace.army.mil

Comment letters should cite the project name, applicant name, and public notice number to facilitate review by the Regulatory Permit Manager. Comments may include a request for a public hearing on the project prior to a determination on the Department of the Army permit application; such requests shall state, with particularity, the reasons for holding a public hearing. All substantive comments will be forwarded to the applicant for resolution or rebuttal. Additional project information or details on any subsequent project modifications of a minor nature may be obtained from the applicant and/or agent or by contacting the Regulatory Permit Manager by telephone or e-mail (cited in the public notice letterhead). An electronic version of this public notice may be viewed under the Public Notices tab on the USACE website: https://www.spn.usace.army.mil/Missions/Regulatory


Regulatory Links

Redirecting...

Contact Information

Department of the Army
San Francisco District, Corps of Engineers
Regulatory Division
450 Golden Gate Ave., 4th Floor
San Francisco, California 94102-3404

Phone Number: (415) 503-6795
Fax Number: (415) 503-6693
cespn-regulatory-info@usace.army.mil